The most common questions
- Why chooseelite calfing compagny?
- Is the business insured?
- Are caulkers insured or covered by the CSST?
- Do you have a licence with the RBQ?
- Can I have a cost estimate over the phone, do you need to visit the premises in order to bid?
- Do we have to be present at the estimate?
- Do you provide written quotes?
- Why is it so important to do the caulking again?
- What are the potential savings in energy costs if we do the caulking again?
- When is it possible to do the caulking again?
- How do I know if it’s time to do the caulking again?
- We plan to have new windows installed in the next 2 to 3 years, but the current caulking needs to be redone. What to do?
- When is it possible to do the caulking again?
- How do I know if it’s time to do the caulking again?
- We plan to have new windows installed in the next 2 to 3 years, but the current caulking needs to be redone. What to do?
- What type of sealant should be used?
- Can we choose the color of the new sealant?
- Can the color of the sealant change over time?
- Are there sealants that are better suited to certain climatic conditions?
- How can we pay for the caulking work?
- Do I have to give a deposit at the signing of the contract? If so, when?
- Do we need a permit and signage? If so, who is doing it?
- Should the work be done by employees with CCQ competency cards?
- Who can use the lifting equipment?
- Do I have to redo all the caulking joints at the same time?
- Are you repairing the masonry?
- Should mortar seals be sealed in the lightening of doors and windows?
- Do you repair elements of the roof?
Do we need a permit and signage? If so, who is doing it?
As soon as we have to encroach on public roads (streets, sidewalks, alleys, etc.) with our equipment (ladders, pods, etc.), we have no choice but to obtain an occupancy permit from the municipal authorities.
In order to obtain this permit, we are also required to submit a signage plan that will allow us to work safely and legally on the site.
There are, of course, additional fees for permits and signage, and it is difficult to estimate the costs accurately. Street type, space, occupancy time and signage requirements are all factors that dictate costs.
For logistical and planning reasons, Elite Calfeutrage handles the formalities for you. These additional costs, including a small administrative burden, are never included in the bid.
Should the work be done by employees with CCQ competency cards?
Several renovation projects are subject to the various collective agreements in place in the construction industry. In such cases, Elite Caulking must report the hours worked for each employee assigned to various subject projects.
It is the type of building and certain specific conditions that determine whether or not your project is subject to CCQrates.
Single-family principal residences (residential areas) are among the only classes of buildings that are not subject to them. Failure to comply with these regulations may result in the closure of a construction site and the imposition of hefty fines.
Who can use the lifting equipment?
Some lifting equipment requires recognized accreditation in order to operate them safely. Failure to comply with these regulations can result in the closure of a construction site and the imposition of heavy fines.
Do I have to redo all the caulking joints at the same time.